SEGRO Industrial Park Tychy 2

Śląskie, Śląsk, Tychy, Przejazdowa 99

SEGRO Industrial Park Tychy 2 –  general information

Location

SEGRO Industrial Park Tychy 2 is located in Tychy, Urbanowice district at Przejazdowa Street. The investment is situated in the immediate vicinity of the national road No. 44 and 4 km from the intersection of S1 and national road No. 44. The facility is located 18 km from A4 motorway and 32 km from A1 motorway.

Park's description

  • Wide maneuvering yards.
  • Parking places for trucks and personal cars.
  • Fully fenced park with 24-hour security service.
  • Central gatehouse equipped with recording CCTV system.

Rent: Contact us

Technical specification

Status
completed
Existing park space
41 217 m²
Planned space
0 m²
Space under construction
0 m²
Target space
41 217 m²
Vacancy
Minimal module
— m²
Owner
Segro Poland Sp. z o.o.

Contact us

Contact us

SEGRO Industrial Park Tychy 2 –  detailed information (5 warehouses)

SEGRO Industrial Park Tychy 2 D1

Status
completed
Completion date
2017 Q4
Minimal module
— m²
Area (total/under construction/planned)
5 258 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
—
Level 0/0 gateways
—
Crossdock
—
Railway siding
—
Gantry
—
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
200 lux

SEGRO Industrial Park Tychy 2 D2

Status
completed
Completion date
2018 Q4
Minimal module
— m²
Area (total/under construction/planned)
4 173 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
—
Level 0/0 gateways
—
Crossdock
—
Railway siding
—
Gantry
—
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
200 lux

SEGRO Industrial Park Tychy 2 D3

Status
completed
Completion date
2019 Q1
Minimal module
— m²
Area (total/under construction/planned)
7 628 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
—
Level 0/0 gateways
—
Crossdock
—
Railway siding
—
Gantry
—
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
200 lux

SEGRO Industrial Park Tychy 2 E1

Status
completed
Completion date
2016 Q4
Minimal module
— m²
Area (total/under construction/planned)
14 317 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
—
Level 0/0 gateways
—
Crossdock
—
Railway siding
—
Gantry
—
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
200 lux

SEGRO Industrial Park Tychy 2 E2

Status
completed
Completion date
2017 Q4
Minimal module
— m²
Area (total/under construction/planned)
9 841 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
—
Level 0/0 gateways
—
Crossdock
—
Railway siding
—
Gantry
—
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
200 lux

Warehouses for rent in region

The specified conditions are for informational porposes only and do not constitute a commercial offer pursuant to the law with respect to act of April 23rd, 1964 the Civil Code (Journal of Laws 1964, no. 16, pos. 93 with later alterations).