P3 Mszczonów

Mazowieckie, Warsaw III, Mszczonów, Pogorzałki 19, Tarczyńska 100, Magazynowa 4, Ługowa 88

P3 Mszczonów –  general information

Location

P3 Mszczonów is located in the close vicinity of the national road No. 50 and only 3 km from the S8 expressway. It is situated 20 km from A2 motorway junction and 45 km from Frederic Chopin Airport in Warsaw.

Park's description

  • Wide maneuvering yards – minimum 35 m depth.
  • Ample parking places for trucks and personal cars.
  • Fully fenced park with 24-hour security service.
  • Central gatehouse equipped with recording CCTV system.
  • Rail siding.

Rent: Contact us

Technical specification

Status
planned, completed
Existing park space
71 568 m²
Planned space
55 250 m²
Space under construction
0 m²
Target space
126 818 m²
Vacancy
Minimal module
— m²
Owner
GIC Private Ltd.

Contact us

Contact us

P3 Mszczonów –  detailed information (6 warehouses)

P3 Mszczonów #1

Status
planned
Completion date
Minimal module
— m²
Area (total/under construction/planned)
11 353 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

P3 Mszczonów #10

Status
planned
Completion date
Minimal module
— m²
Area (total/under construction/planned)
20 460 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

P3 Mszczonów #6 (HOPI)

Status
completed
Completion date
2021 Q3
Minimal module
— m²
Area (total/under construction/planned)
33 850 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

P3 Mszczonów #7a (InPost)

Status
completed
Completion date
2020 Q3
Minimal module
— m²
Area (total/under construction/planned)
17 297 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

P3 Mszczonów #7b

Status
completed
Completion date
2024 Q1
Minimal module
— m²
Area (total/under construction/planned)
20 421 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

P3 Mszczonów #9

Status
planned
Completion date
Minimal module
— m²
Area (total/under construction/planned)
23 437 m²
Vacancy
Column grid
12 × 22.5
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Warehouses for rent in region

The specified conditions are for informational porposes only and do not constitute a commercial offer pursuant to the law with respect to act of April 23rd, 1964 the Civil Code (Journal of Laws 1964, no. 16, pos. 93 with later alterations).