Altmaster Centrum Logistyczne Pęcice

Mazowieckie, Warsaw II, Pęcice, Sokołowska 50

Altmaster Centrum Logistyczne Pęcice –  general information

Location

Altmaster Centrum Logistyczne Pęcice is located in Pęcice, at Sokołowska Street. It is situated in close proximity to the S8 expressway, just 6 km from the S2 route, 16 km from Warsaw Fryderyk Chopin Airport and 19 km from Warsaw city centre.

Park's description

  • Wide maneuvering yards – minimum 35 m depth
  • Ample parking places for trucks and personal cars
  • Fully fenced park with 24-hour security service
  • Central gatehouse equipped with recording CCTV system

Rent: Contact us

Technical specification

Status
completed, under construction
Existing park space
34 500 m²
Planned space
0 m²
Space under construction
10 600 m²
Target space
45 100 m²
Vacancy
Minimal module
— m²
Owner
Altmaster Sp. z o.o.

Contact us

Contact us

Altmaster Centrum Logistyczne Pęcice –  detailed information (5 warehouses)

Altmaster Centrum Logistyczne PĘCICE 1

Status
completed
Completion date
2009 Q3
Minimal module
— m²
Area (total/under construction/planned)
10 000 m²
Vacancy
Column grid
22 × 9.6
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Altmaster Centrum Logistyczne PĘCICE 2

Status
completed
Completion date
2016 Q2
Minimal module
— m²
Area (total/under construction/planned)
7 000 m²
Vacancy
Column grid
22 × 9.6
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Altmaster Centrum Logistyczne PĘCICE 3A

Status
completed
Completion date
2016 Q3
Minimal module
— m²
Area (total/under construction/planned)
3 000 m²
Vacancy
Column grid
22 × 9.6
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Altmaster Centrum Logistyczne PĘCICE 3B

Status
completed
Completion date
2020 Q1
Minimal module
— m²
Area (total/under construction/planned)
14 500 m²
Vacancy
Column grid
22 × 9.6
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Altmaster Centrum Logistyczne PĘCICE 4

Status
under construction
Completion date
2024 Q4
Minimal module
— m²
Area (total/under construction/planned)
10 600 m²
Vacancy
Column grid
22 × 9.6
Sprinklers
yes
Clear height
10 m
Building depth
— m
Floor loading capacity
5 t/m²
Fire load
— MJ/m²
Number of docks
Level 0/0 gateways
Crossdock
Railway siding
Gantry
Skylights
yes
Smoke vents
yes
Heating
no
Lightning level
0 lux

Warehouses for rent in region

The specified conditions are for informational porposes only and do not constitute a commercial offer pursuant to the law with respect to act of April 23rd, 1964 the Civil Code (Journal of Laws 1964, no. 16, pos. 93 with later alterations).